Production technology
Cam Pha Cement Plant project uses rotary kiln technology according to dry method, advanced technology equipment, saves fuel and electricity consumption with main technical indicators: heat energy consumption Q = <730 Kcal / kg clinker; Power consumption = <95 KWh / ton of cement; dust concentration of exhaust gases from the chimney mouth = <30 ​​mg / Nm3.
 
1. Location and land use area (including line 2 expansion area)
- Cam Pha Cement Plant is located in Cam Thach Ward, Cam Pha City, Quang Ninh Province with a land use area of ​​70 hectares and Cam Pha Cement Grinding Station is located in My Xuan Industrial Park, Tan Thanh District, Ba Ria - Vung Tau province with an area of ​​20 ha of land use.
 
2. Project Size
- Capacity of 2.3 million tons of cement PCB40 / year (phase 1 from 2003-2008), including: Cam Pha Cement Plant with a capacity of 6,000 tons of clinker / day, night, equivalent to 1,890,000 tons of clinker / year, only crushing at the main factory 690,000 tons of clinker / year, equivalent to 820,000 tons of cement PCB40 / year; Cam Pha Cement Crushing Station receives and grinds 1,200,000 tons of clinker / year from Cam Pha Cement Plant, equivalent to 1,480,000 tons of cement PCB40 / year.
 
3. Technology equipment
- The project uses the rotary kiln technology according to the dry method, advanced production technology equipment in the world today, saves fuel and electricity consumption with the main technical criteria: heat energy consumption Q = <730 Kcal / kg clinker; Power consumption = <95 KWh / ton of cement; dust concentration of exhaust gases from the chimney mouth = <30 ​​mg / Nm3. Other criteria on wastewater, noise level, and solid waste are consistent with the Law on Environmental Protection of Vietnam.
 
 
4. The main source of raw materials, fuel
- Limestone: exploited at Quang Hanh II limestone quarry, 6.830m from the factory site, with a reserve of about 260 million tons, ensuring enough supply for 2 production lines for more than 50 years.
- Clay: exploited at Ha Chanh clay mine, Quang Ninh province, the reserve of clay mine is about 28 million tons, ensuring enough supply for 2 production lines for over 50 years.
- Fuel using coal dust 4aHG in Quang Ninh.
- Other raw materials such as silica, laterite in Quang Ninh; gypsum imported from countries in the region; diatomite in Hai Phong; puzzolan in Ba Ria - Vung Tau.
- Electricity: is supplied from the 220/110 kV transformer station in Hoanh Bo, Quang Ninh. After 2007, get electricity from the transformer station of Cam Pha Thermal Power Plant, Quang Ninh.
- Water: demand is 2,500 m3 / day supplied from Dien Vong Water Plant, Quang Ninh with a capacity of 60,000 m3 / day.
 
5. Transport: by waterway and by road
- Cam Pha Cement Factory: import port for ships of 5,000 DWT and export port for ships of 15,000 DWT in accordance with the seaport system of Cua Ong area.
- Cam Pha Cement Grinding Station: includes an import berth for ships of 15,000 DWT and a cement export berth for ships of 500 DWT.
 
6. Building grade and fire resistance grade
- The project is built with modern, solid industrial architecture, reinforced concrete frame structure or steel frame, suitable for equipment installation requirements and usage requirements of each work item, ensuring sustainability and construction technical standards. Work grade: grade I, for main works, grade II for auxiliary works and fire-resisting grade: Level I, for works at risk of fire and explosion; level II for the remaining work items.